Journal of 7/16/2012 – 7/17/2012

The base camp is almost ready for permanent stay. I slept last night in the room that configured as a temporary living place. I gonna get or build cookeries, a refrigerator, and few other stuff by end of this weekend.

A big weed

A cat

도라지 꽃

A dog

After removal of concrete layer on the ceiling

Bought four steel supports – each 10,000 KWR – to secure the main frames while demolishing the concrete walls

Being wet by rain and moisture in the air distorted the door panel up to 1cm, straightened it using three square rods.

My bed

The base camp.

About janpenguin

Email: janpenguin [at] riseup [dot] net Every content on the blog is made by Free and Open Source Software in GNU/Linux.
This entry was posted in Permaculture and tagged , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s